FULL AUTOMATIC PLANT O₂ / N₂O / CO₂ / He / Ar 150m h
As Köksal Medical, we are working carefully with our engineer staff at every stage to eliminate the risks. We always act carefully at every stage where the medical gas system installation will be implemented: at the project stage, at the design stage, at the construction site, at the installation stage and at the installation in the hospital.